The M/T “Beta” joined the APEX fleet on 22 June 2026, adding another modern MR product tanker to our growing fleet. Equipped with technologies supporting energy efficiency, environmental compliance, and reliable performance, the “Beta” strengthens our ability to meet the evolving needs of our customers while moving forward with confidence.

General information

Built by
HD Hyundai Heavy Industries Co., Ltd.
Delivered on
22/06/2026
Vessel type
MR Product Tanker (39,256 DWT)

Details of major equipment/machinery on board

Main engine
Hyundai MAN B&W, 6S50ME-C9.7-HPSCR (Power: 6,700 kW / Speed: 96.6 RPM)
M/E Selective Catalytic Reduction System (SCR)
NoNOx 2S-HP-M SCR
Auxiliary engines
Hyundai HIMSEN, 6H21M (Power: 1,050 kW × 3 sets / Speed: 900 RPM)
Exhaust gas cleaning system (EGCS)
PANASIA, PaSOx smart v4.0 (type: open loop/capacity: 71,720 kg/h)
Ballast Water Treatment System (BWTS)
SunRui BalClor, BCS2000

Framo Cargo Pumping System

Consumersm3/h
12 Cargo Pumps600
2 Slop Tank Pumps (Sd150)300
1 Portable Pump (Tk80)70
2 Ballast Pumps (Sb300)750
1 Tank Cleaning Pump (Ma)100
Fresh Water Generator
ILSEUNG ISF-20C (20 tonnes/day)
Auxiliary boiler
KANGRIM (15.000 KG/HR)
Composite boiler
KANGRIM

List of energy-saving devices (ESDs) installed on board

  • Selective Catalytic Reduction (SCR) system
  • SunRui BalClor Ballast Water Treatment System
  • Composite boiler
  • Air-chamber stern tube sealing system (KEMEL AX-600)

More APEX News

Welcome, APEX Bulletin+

The APEX Bulletin+ aims to strengthen communication, knowledge sharing, and safety culture across Apex Shipping & Energy Ltd. In the following pages, Managing Director Mr Kriton Lendoudis outlines the vision and strategic thinking behind th

Read More »

Welcome, “Camaro”, to the APEX fleet

The M/T “Camaro” joined the APEX fleet on 12 March 2026, bringing with her a strong focus on efficiency and responsible operation. Built by Jiangsu New Yangzi Shipbuilding Co., Ltd., the “Camaro” features advanced systems and energy-saving

Read More »

Welcome, M/T “Aragon”, to the APEX fleet

The M/T “Aragon” joined the APEX fleet on 27 May 2026, bringing with her a strong focus on efficiency and responsible operation. From energy-saving systems to technologies designed to reduce environmental impact, the “Aragon” reflects our o

Read More »

Introducing the M/T “Beta”

The M/T “Beta” joined the APEX fleet on 22 June 2026, adding another modern MR product tanker to our growing fleet. Equipped with technologies supporting energy efficiency, environmental compliance, and reliable performance, the “Beta” stre

Read More »